Energy Performance Contract

Fan control and cooling optimisation for a 24/7 glass manufacturer, delivered during short outage windows with no disruption to production. About 730 cars off the road each year and a 1.9-year payback.

A Climatech Zero engineer and a site team member reviewing notes beside a glass bottle production line

Project results

730
cars

Emissions reduction, equal to cars off the road each year

1.9
years

Payback

Zero

Production disruption

How we did it

We partnered with a glass manufacturer in NSW to optimise fan control and cooling across a 24/7 production operation, delivered under our Energy Performance Contract and without disrupting production. The result: a 1.9-year payback and an emissions reduction equivalent to taking about 730 cars off the road each year, alongside a lift in production yield.

Every change was designed around the site's tight outage windows, so the client gained the benefits without losing a single hour of output.

The challenge

The site runs around the clock, 365 days a year, and its production lines rarely stop. The only breaks come during planned product changeovers: a few hours, every two to three months, with little notice. That left a very small window to install and commission new equipment without affecting production.

The model

Rather than treat fan control and cooling as separate equipment upgrades, we took a performance-first approach under an Energy Performance Contract. Using data from across the site, we designed a bespoke control strategy for each cooling fan, then monitored and tuned performance after installation.

The delivery

Delivery was built around the client's production schedule. Our team stayed on standby, ready to mobilise as soon as an outage was confirmed, sometimes with only days' notice. Across four separate outages, we integrated and commissioned four new fan control PLCs and installed a brand-new cooling fan for one production line, with no disruption to production. The project was delivered in close partnership with the client's site team.

The results

Verified results show a significant cut in emissions, equivalent to about 730 cars off the road each year, improved cooling reliability and a lift in production yield. The project paid for itself in just 1.9 years, with continuous monitoring keeping performance on track long after the final outage.

Recent projects