Flour Mill, VIC

Food and Beverage
Energy Performance Contract

Whole-of-plant energy optimisation for a complex flour mill, delivered without affecting throughput or quality. A 6% reduction in electricity use, $137,129 in annual electricity savings and a 7.4-year payback, supported by state government funding.

White grain silos and a conveyor gantry under a blue sky

Project results

6%

Electricity reduction

$137,129

Annual electricity savings

7.4
years

Payback

How we did it

We partnered with a flour mill in Victoria to improve process efficiency across one of Australia's most complex industrial sites, delivered under our Energy Performance Contract without affecting output or product quality. The result: a 6% reduction in electricity use, $137,129 in annual electricity savings and a 7.4-year payback, supported by state government funding.

Control upgrades, system consolidation and targeted mechanical and electrical improvements came together under a single performance framework, with results verified through our energy management platform.

The challenge

The mill is a highly advanced facility with intricate process flows, interlinked pneumatic systems and multiple production stages. Understanding how every part connects takes real time and effort before energy-saving opportunities can be found, and any change had to protect throughput, yield and quality.

The model

Rather than fix one system at a time, we took a whole-of-plant approach under an Energy Performance Contract. We mapped the site's processes in detail, developed solutions alongside the client's operations, maintenance and engineering teams and leading milling specialists, and bundled multiple measures into one performance-led project. A successful state government grant of $624k helped offset capital costs and strengthen the return.

The delivery

The project targeted the site's major energy-consuming systems across the flour mill, grain intake and handling plant, and bulk dispatch areas. We introduced new control strategies to minimise equipment running while idle, consolidated blower systems and reconfigured pipework to reduce pressure losses, and installed variable speed drives on more than ten fans and blowers. Every system was connected to our energy management platform for ongoing visibility.

The results

Verified results show a 6% reduction in electricity use and $137,129 in annual electricity savings, with a simple payback of 7.4 years. The site now has improved control and reliability across critical systems, stronger collaboration between operations and engineering teams, and a platform its team continues to use to generate ideas for future projects.

Recent projects

More case studies

See all case studies

Find out what your site could be saving

An Opportunity Assessment is a low cost, one to two day site review. It establishes how energy is used across your site, the value of the savings available, and the funding pathways open to you, including government grants.

Get in touch