How we can manage to achieve energy saving goals while dealing with multiple challenges

Coal Mine NSW

PROJECT TYPE: project

Industry: MINING
Status IN PROGRESS

the challenge

This particular processing plant is sandwiched between two large operations; mining on one end and logistics on the other. Logisitics has a large cost to operate as does the mine. The project proposed is to optimise the operation to meet the needs of both the mine and logistics while using the least amount of energy possible to run the plant.

The solution

Our specialist team of engineers have conducted an onsite assessment and are currently reviewing the data and information collected.